KRC Environmental Services — an integrated team of scientists, engineers and environmental professionals serving the Philippines.
KRC Environmental Services is composed of an integrated team of scientists, engineers and environmental professionals with expertise and vast technical knowledge in different areas of environment, ecology, health and safety for regulatory compliance, monitoring, research and development.
Environmental science expertise across ecology and natural systems.
Technical engineering knowledge for complex environmental projects.
Specialized expertise in health, safety, and regulatory compliance.
Monitoring, research and development across all environmental fields.
To provide professional environment, health and safety, and social consultancy services, along with innovative solutions, practical strategies to fulfill the client's objectives and legal responsibilities, while safeguarding people and the environment.
To be one of the premier environmental consultancy services in the Philippines.
Environmental Services
Dr. Maria Carmela Capule has more than 30 years of experience in both government and private practice in environmental management with expertise in all aspects of the environment. She is the adviser of the Environmental Practitioners Association Inc. (EPA), president of the Industrial Hygienists Association of the Philippines Inc. (IHAP), and treasurer of the Air and Waste Management Association – Philippine Section (AWMA).
She is the chairman of the Laboratory Accreditation Technical Committee (LATC) in Chemical Testing and a technical assessor of ISO/IEC 17025:2017 by the Philippine Accreditation Bureau under the Department of Trade and Industry (PAB-DTI). She became a technical assessor for laboratory accreditation by the Environmental Management Bureau of the DENR. She is an accredited EIA preparer, with accreditation no. IPCO-045, issued by the DENR-EMB. She is an accredited Occupational Safety and Health (OSH) consultant. She is an accredited ADB local environmental specialist.

Engr. Marilou P. Avenido has more than 30 years of experienced in both Government and Private Practice in Environmental Management with expertise in Chemical and Hazardous Waste Management. She became the OIC of Environmental Impact Assessment Section and Chief of Toxic Chemicals and Hazardous Wastes Section at the Environmental Management Bureau of the Department of Environment and Natural Resources Region III. She is an accredited EIA preparer with accreditation no. IPCO-044 issued by the DENR-EMB.

Mr. Ricardo Capule is the President and owner of KRC Environmental Services. He is specialized in Water and Wastewater Treatment Design, Air Pollution Control Design specific on Power Plants. He had been with Hyundai Engineering in Seoul, South Korea as Team Leader, Power Plant Department for nine (9) years.
President, ACCUSERVICES INC. He worked as Air Quality Monitoring Manager at CRL Calabarquez Corp. from 2004-2007. He was a former employee of the Environmental Management Bureau, Region III as Environmental Specialist. His expertise is on water, wastewater and power plant designs, hazardous waste treatment, air pollution control and noise. He is a registered EIA Preparer of EMB.
Loan No. 3886-PHI: Infrastructure Preparation and Innovation Facility – Additional Financing (IPIF-AF)
| No. | Name and Location of Project |
|---|---|
| 1 | CONSULTING SERVICES FOR THE INFRASTRUCTURE PREPARATION AND INNOVATION FACILITY – ADDITIONAL FINANCING – 02 DETAILED ENGINEERING DESIGN FOR LAGUNA LAKESHORE ROAD NETWORK PROJECT (LOAN NO. 3886-PHI) Taguig, Muntinlupa, Binan, San Pedro, Sta. Rosa, Cabuyao and Calamba, Laguna |
| 2 | Social Conditions and Structures Survey on the Project for Capacity Development in Coastal Engineering for Disaster Resiliency Luzon, Visayas and Mindanao |
| 3 | BATANGAS 3 Solar Hybrid Power Project Nasugbu, Batangas |
| 4 | Construction of ASCOM Facilities Project Tarlac |
| 5 | Panay-Guimaras-Negros (PGN) Island Bridges Project Iloilo, Guimaras, Negros Occidental (Republic of China grant) |
| 6 | Contract ID: 20CSE012 Conduct of EIA Study, Preparation of EIS Report and application of ECC of Widening of Calapan South Road (CSR) from two (2) lanes to four (4) lanes including bridge length = 107.462km Oriental Mindoro |
| 7 | Construction of New Senate Building Project NCR |
| 8 | Consulting Services for the Preparation of Environmental Impact Statement and Facilitation of ECC Application for the New Clark City (NCC) Project Pampanga and Tarlac |
| 9 | Road Network Development Project in Conflict-Affected Areas in Mindanao (JICA) |
| 10 | Sub-Project 1: Matanog-Barira-Alamada-Libuangan Road including 6 bridges Matanog, Barira, Buldon, Lanao del Sur |
| 11 | Sub-Project 2: Parang-Balabagan Road Kapatagan and Balabagan, Lanao del Sur, Parang and Matanog, Maguindanao |
| 12 | Sub-Project 5: Maganoy-Lebak Road |
| 13 | Sub-Project 6: Tapian-Lebak Road Datu Blah Sinsuat, Maguindanao and Lebak, Sultan Kudarat |
| 14 | Sub-Project 7: Marawi Ring Road Project Marantao, Piagapo, Saguiran and Islamic City of Marawi, Lanao del Sur |
| 15 | Sub-Project 8: Parang-East Diversion Road Parang, Maguindanao |
| 16 | Sub-Project 9: Manuangan-Parang Road Parang, Sultan Mastura, Sultan Kudarat, Maguindanao and Pigcawayan, North Cotabato |
| 17 | PROPOSED PHILIPPINE SPORTS CITY AND NATIONAL GOVERNMENT ADMINISTRATIVE CENTER (New Clark City) Pampanga and Tarlac |
| 18 | Conduct of Environmental Surveys for the Proposed Clark – Bamban Capas Access Road, McArthur – Clark Green City Access Road, MacArthur SCTEX Access Road and Olympic Village Access Road Pampanga and Tarlac |
| 19 | FEASIBILITY STUDY OF THE PROPOSED CONSTRUCTION OF BRIDGES THAT WILL CROSS THE PASIG-MARIKINA RIVER AND MANGGAHAN FLOODWAY (6 BRIDGES); Eastbank – Westbank Bridge 1, Eastbank – Westbank Bridge 2, JP Rizal – Lopez Jaena Bridge, JP Rizal – St. Mary Bridge, Marikina – Vista Real Bridge, Mercury – Evangelista Bridge |
| 20 | THE PREPARATORY SURVEY FOR CAVITE INDUSTRIAL AREA FLOOD MANAGEMENT PROJECT (CONSTRUCTION OF 5 BRIDGES AND IMPROVEMENT OF 2 BRIDGES AS COMPONENTS) |
| 21 | EXPANSION OF CLARK INTERNATIONAL AIRPORT PASSENGER TERMINAL (FOUR LANE ROAD NETWORK WITH LENGTH OF 4 KM AS COMPONENT) Pampanga |
| 22 | WESTCHINAMIN GUINABON NICKEL MINING PROJECT (MPSA NO. 316-2010-III) – WITH ACCESS ROAD AS COMPONENT |
| 23 | BIOETHANOL PLANT IN CO-GENERATION WITH WASTE TO ENERGY POWER PLANT FOR REFUSE DERIVED FUELS (FARM TO MARKET ACCESS ROAD AS COMPONENT) |